Force Disable Module

Overview

When there is a component which cannot be isolated from the storage system in a normal way, this function forces the component to be isolated from the storage system (called "force disable" hereinafter).

This function is used when preparing a component to be removed from the storage system using the hot maintenance or hot preventive maintenance functions, and the status of the component cannot be changed to normal. If the component is installed in the storage system, this function can be performed, irrespective of the status.

Availability of Force Disable (for the ETERNUS DX600 S6) (Force disable is possible: , Force disable is not possible or not applicable: -)

Component Force Disable
Controller Enclosure (CE) -
  Controller Module (CM)
  Memory -
BUD
FAN Unit -
PCIe SW -
64G FC-CA
  SFP+
32G FC-CA
  SFP+
16G FC-CA
  SFP+
10G iSCSI-CA
  SFP+
SAS-DA
  Backend Cable
NVMe-DA
  Backend Cable
CBP -
Controller Enclosure Power Supply Unit (CPSU)
Operation Panel (OPNL) -
Battery Unit -
  Battery Control Unit (BCU)
Battery Unit (BTU)

Drive

Drive Enclosure (DE) -
 

Power Supply Unit (PSU)

Drive
Panel -
I/O Module (IOM)
Backend Cable (IN)
Backend Cable (OUT)
Power Cord -

Availability of Force Disable (for the ETERNUS DX8100 S6) (Force disable is possible: , Force disable is not possible or not applicable: -)

Component Force Disable Module
Controller Enclosure (CE) -
  Controller Module (CM)
  Memory -
BUD
FAN Unit -
PCIe SW -
64G FC-CA
  SFP+
32G FC-CA
  SFP+
16G FC-CA
  SFP+
10G iSCSI-CA
  SFP+
Controller Enclosure Power Supply Unit (CPSU)
Operation Panel (OPNL) -
Battery Unit -
  Battery Control Unit (BCU)
Battery Unit (BTU)
Power Cord -
Drive
(*1)
*1  :  A component that is installed in the CE of the ETERNUS DX8100 S6.

Availability of Force Disable (for the ETERNUS DX900 S6 or the ETERNUS DX8900 S6) (Force disable is possible: , Force disable is not possible or not applicable: -)

Component Force Disable Module
Controller Enclosure (CE) -
  Controller Module (CM)
  Memory -
BUD
FAN Unit -
PCIe SW -
FRT Port -
Management Cable -
64G FC-CA
  SFP+
32G FC-CA
  SFP+
16G FC-CA
  SFP+
10G iSCSI-CA
  SFP+
SAS-DA
  Backend Cable
NVMe-DA
  Backend Cable
Controller Enclosure Power Supply Unit (CPSU)
Operation Panel (OPNL) -
Battery Unit -
  Battery Control Unit (BCU)
Battery Unit (BTU)
Power Cord -
Drive
Frontend Enclosure (FE) -
  Frontend Enclosure Power Supply Unit (FE PSU)
Frontend Router (FRT)
  Frontend Cable
Service Controller (SVC)
  Port -
Management Cable
FE MP -
FE MP BRG -
Operation Panel (OPNL)
FAN Unit (FANU)
FPO-SW -
Drive Enclosure (DE) -
 

Power Supply Unit (PSU)

Drive
Panel -
I/O Module (IOM)
Backend Cable (IN)
Backend Cable (OUT)
Power Cord -
Caution

Display Contents

[Test Connection] Screen

This screen is displayed when the Main CM is affected by the force disable.

Follow the displayed procedure to confirm that the new Main CM is connected to a LAN.

Function Button

Button Description

[Test Connection]

Click this button after confirming that the new Main CM is connected to a LAN.

The connection status of the new Main CM and the LAN is checked.

[Test Connection Result] Screen

This screen is displayed when the Main CM is affected by the force disable.

The connection status check result of the new Main CM and the LAN is displayed.

Function Button

Button Description

[Test Connection]

If connection has failed, reconfirm the new Main CM is connected to a LAN, and click this button.

The connection status of the new Main CM and the LAN is checked again.

[Resume Processing]

Click this button when connection was successful.

Isolation of the CM starts.

Operating Procedures

  1. Select the component to perform the force disable on, and click [Force Disable] in [Action].

    → A confirmation screen appears.

    Caution
    • When there is a component which can be affected by force disable, a message to that effect is displayed. Check the component which might be affected.

  2. Click the [OK] button.

    → The operations to be started and the displayed screen vary depending on the conditions as follows.

    • When the Main CM can be affected by the force disable

      → The Main CM is switched, and the [Test Connection] Screen appears. Proceed to Step 3.

    • When the Main CM cannot be affected by the force disable

      → Isolation of the target component starts. Proceed to Step 6.

  3. Follow the displayed procedure to confirm that the new Main CM is connected to a LAN.

  4. After confirming the connection, click the [Test Connection] button.

    → The [Test Connection Result] Screen appears.

  5. Confirm the connection status check result, and click the [Resume Processing] button.

    → Isolation of the target component starts.

    Caution
    • If the connection of the new Main CM and the LAN fails, check the connection status again and return to Step 4.

  6. Click the [Done] button to return to the screen when the target component was selected in Step 1.